Week 2

 

The Second Week Back

 This week we focused on completion of 30% of the project which included milestones for each subsystem to complete as well as Completing Deliverable 5.

 Kinematic/Kinetic Implementation and Risk Assessment (Elijah)

  • Implemented the foundation of kinematic tracking with a single motor and translating that to a correlating screen position (responsible for the moon moving on screen)
  • Implemented the foundation of kinetic response to path deviation with a single motor, increasing the applied acceleration to a correction to ultimately control the torque to output the specified force on the handle
  • Implemented correction timing mechanic, in which the user can correct themselves within a specified time limit before the motor takes effect

  • completed sections 5.4-5.5 focusing on risk assessment and implementation


End Connectors CAM and Assembly Drawings (Sean)

  • Completed CAM for End Connectors
  • Discussed CAM with Blake Shishido

  • Completed Drawings for Full Assembly as well as individual models
  • Compiled Calculations
https://drive.google.com/file/d/1iHPk8L-KatKdH58lmTzqFZ5KOWFU3Qly/view?usp=sharing
Attached is a link to the video as the file size exceeds the blog's limits

Handle Drawings (Nathan)

  • Completed Drawings for Handle


Stand Partially Welded and Budget (Gavin)

  • Tacked and Welded bottom portion of the stand
  • Completed Drawings for the stand
  • Completed Budget for Deliverable 5