Week 2
The Second Week Back
This week we focused on completion of 30% of the project which included milestones for each subsystem to complete as well as Completing Deliverable 5.
Kinematic/Kinetic Implementation and Risk Assessment (Elijah)
- Implemented the foundation of kinematic tracking with a single motor and translating that to a correlating screen position (responsible for the moon moving on screen)
- Implemented the foundation of kinetic response to path deviation with a single motor, increasing the applied acceleration to a correction to ultimately control the torque to output the specified force on the handle
- Implemented correction timing mechanic, in which the user can correct themselves within a specified time limit before the motor takes effect
- completed sections 5.4-5.5 focusing on risk assessment and implementation
End Connectors CAM and Assembly Drawings (Sean)
- Completed CAM for End Connectors
- Discussed CAM with Blake Shishido
- Completed Drawings for Full Assembly as well as individual models
- Compiled Calculations
https://drive.google.com/file/d/1iHPk8L-KatKdH58lmTzqFZ5KOWFU3Qly/view?usp=sharing
Attached is a link to the video as the file size exceeds the blog's limits
Handle Drawings (Nathan)
- Completed Drawings for Handle
Stand Partially Welded and Budget (Gavin)
- Tacked and Welded bottom portion of the stand
- Completed Drawings for the stand
- Completed Budget for Deliverable 5