Week 3 (Final)
Strategy Brainstorming
For this week we did a lot of brainstorming and coming up with strategies that could allow us to achieve our goal and followed our problem definition.
Raw Strategy Generation
- Below are the raw pictures of these strategies
Strategy Organization
- After coming up with the strategies (20 total), they were organized in a MindMap (seen below)
Final 3 Strategies
For an in-depth listing of the merits for each strategy, visit the following doc:
- Tabletop device that provides resistance in game-like format
- Fluid Resistance Chamber
- Track Patient Activity/Performance (Hands Off) + Therapist Alert
Concept Brainstorming
After coming up with strategies we moved onto making 40 different concepts for the best 3 strategies, totaling 120 in the end.
Raw Concept Generation
- Below are the photos from the brainstorming session with the following color scheme:
- Black: Tabletop Strategy
- Blue: Fluid Strategy
- Red: Activity Track Strategy
Concept Organization
- Once the concepts were generated (with more added past the original brainstorming session), they were placed into respective MindMaps.
- Tabletop Concepts Map
Final 9 Concepts
For an in-depth +/- on each concept, visit the doc (menu on left side of doc):
- Tabletop Strategy
- Handle on Covered Gantry System
- Exposed Linkages Mounted to Table
- Semi-Circular Dual Handle
- Fluid Strategy
- Mini Parachutes on Hand
- Self-Contained Water Box
- Stationary Boat
- Activity Tracking Strategy
- Computer Vision (Xbox Kinect)
- Similar Issue Grouping
- VR (Immersive) Therapy
Top Concept
- The top concept we decided on was as follows:
Tabletop Device Consisting of:
a Covered Gantry System
a Monitor Displaying a Course Correction Mode
- To view the more formal statement of why this was chosen as the top concept, please visit the doc:
Deliverable 2 - Project Management
- The final portion of this week's work was deliverable 2, the project Gantt chart via Jira.
- Below is a picture of the chart, and a link to web version:
Comments
Post a Comment